Sunlight Group logo
Sunlight Group logo
Accessories
AppCertificates
Configuration from A to Z
Control response time
Customer Specific
Devices
EMS
External Signals
InstallationLicenseNetworkQuick StartSafety, maintenance and legal noticesSpecificationsStatus LEDs
Toolbox
Troubleshooting
Video tutorialsWiring & connectivity guidelines

Quick Start

What's in the box?

Always included

  • Sunlight Group EMS
  • AC wall adapter

Optionally included accessories

  • P1 to USB Cable (1,8m)
  • DIN rail mounting kit (only for the PRO version)
  • RS485 to USB adapter (only for the Lite version)
Note
Note

Not every Sunlight Group EMS comes with a P1 to USB Cable and DIN rail mounting kit, check your order if you need this!

Preparation

  • Check if all your devices are integrated.
  • To configure the Sunlight Group EMS you need an Installer account for Smart Energy. If you don't yet have an account as an organization owner, you can register via: Smart Energy.
  • Make sure there is a working and supported grid meter.
Note
Note

For accurate grid measurements, it is recommended to connect directly to the P1 port of the digital meter. It is (generally) not possible to use an energy meter that is already connected to another device (e.g., a hybrid inverter).

Warning
Warning

For installations in Belgium:
The P1 user port of the digital meter is disabled by default. Activation is done through "Mijn Fluvius". After activation online it may take several hours before the digital meter's P1 port provides measurements.

Step-by-step installation

  1. Installation
    • Securely place or install the Sunlight Group EMS in its designated location.
    • Attach any additional equipment to the appropriate interfaces on the Sunlight Group EMS.
    • Insert a network cable into the network port (RJ45) of the Sunlight Group EMS.
    • Connect the Sunlight Group EMS to a power source.
  2. Configuration
    • Log in to the online portal (Smart Energy)
    • Go to "Add controller"
      • Fill in the Serial Number and Verification Code of the controller
      • Claim the controller
    • Go to "Settings"
      • Under "Current Site" select the new controller
    • Go to "Controller Configuration"
    • Follow the quick start guide in the controller interface
  3. Add the end user
    • Log in to your Smart Energy
    • Go to "User Management"
      • Search for the serial number of the installed controller
      • Add the end-user's email address

FAQ (Frequently asked questions)

When I go to "Controller Configuration", it says that the controller is offline.

Steps to undertake:

  • Check the internet connection of the Sunlight Group EMS. Check with your computer if you have internet on the ethernet cable attached to the Sunlight Group EMS.
  • Try scanning on the local network for the Sunlight Group EMS with an IP scanner.
  • Check with the building owner (residential) or network administrator (commercial) if this is a network with fixed IP addresses. The Sunlight Group EMS is by default configured to use DHCP. If you need to change it to a fixed IP address, first connect it to a DHCP network, and change the IP address from there to the necessary fixed IP address.
  • Check if communication over the right outbound network ports is allowed.
Last updated March 11, 2026Edit this page

Network

Previous Page

Safety, maintenance and legal notices

Next Page

On this page

Quick StartWhat's in the box?Always includedOptionally included accessoriesPreparationStep-by-step installationFAQ (Frequently asked questions)