Sunlight Group logo
Sunlight Group logo
Accessories
AppCertificates
Configuration from A to Z
Control response time
Customer Specific
Devices
Boiler
Cloud
Energy Meter
Ev Charging Station
a-TroniXABBAlfenAlpitronicAmtronAutelBlitz-PowerEaseeEnovatesEtrelEVChargeKingFLEXeCHARGEGo-eHuawei EV ChargersIlumenKempowerMyEnergi EV Charging StationsNexBlueOCPPPeblar EV Charging StationsRaedianSchneider ElectricSiemensSMASmappeeSofarTeltonika EV Charging StationsTriathlonVetonVolt-TimeVoolWallbox EV Charging StationsXargeon / ZhongDe EnergyZaptec
Gas Meter
Heat Pump
New integrations
Plc
Pv Hybrid And Battery Inverters
Switched Loads
Water Meter
EMS
External Signals
InstallationLicenseNetworkQuick StartSafety, maintenance and legal noticesSpecificationsStatus LEDs
Toolbox
Troubleshooting
Video tutorialsWiring & connectivity guidelines
DevicesEv Charging Station

Go-e EV charger

Go-e

Supported Devices

Device TypeModbus TCP (Ethernet)RS485
Go-e EV charger✅❌

Configuration

  1. In the go-e application, go to your device, then "Settings".

  2. Go in the "Connection" tab.

Image 1
  1. Go in the "API Settings" tab.
Image 1
  1. Be sure that the "Allow local Modbus TCP API" and "Swap Registers" option are enabled.
Image 1
  1. Then reboot your go-e.
Image 1
Image 1
Last updated December 10, 2025Edit this page

FLEXeCHARGE

Previous Page

Huawei EV Chargers

Next Page

On this page

Go-e EV chargerSupported DevicesConfiguration